NETA MTS recommended test intervals and upcoming maintenance tracking
2 equipment item(s) overdue for maintenance testing. Schedule immediately to maintain NETA compliance.
| Tag | Category | Interval | Last Test Date | Next Due | Status | Days Until Due |
|---|---|---|---|---|---|---|
| SWG-MV-01 | Medium-Voltage Switchgear | 3 years | 2022-08-15 | 2025-08-15 | Overdue | 244d overdue |
| BAT-DC-01 | Battery Systems | 1 year | 2025-03-20 | 2026-03-20 | Overdue | 27d overdue |
| XFMR-1A | Power Transformers | 3 years | 2023-04-20 | 2026-04-20 | Due Soon | 4d |
| BKR-LV-03 | Low-Voltage Circuit Breakers | 3 years | — | — | Never Tested | — |
| ATS-1A | Automatic Transfer Switches | 1 year | 2025-10-05 | 2026-10-05 | Current | 172d |
| RLY-SEL-751A | Protective Relays | 4 years | 2024-01-10 | 2028-01-10 | Current | 634d |
Intervals shown are based on NETA MTS Table 100.A standard frequencies. Actual intervals should be adjusted based on equipment condition, criticality, and reliability-centered maintenance (RCM) analysis.
Annual (12 months)
Batteries, ATS, Generators, UPS
3-Year (36 months)
Switchgear, Breakers, Transformers
4-Year (48 months)
Protective Relays
5-Year (60 months)
Cables, Bus Duct